LPG INSTALLATION
Supagas Wagga Wagga
October 2020
EQUIPMENT USED
Tipper with tag along
Nitrogen truck
Installation of LPG at new Supagas Wagga Depot.
Organise transport and installation of a 106KL tank.
Coordinating the tank hole being excavated.
Installation and painting of pipe work.
Coordinating installation of buildings on site. Organising sand and concrete to be delivered to site.